Yearly – FabLite Manager – Steel Project Control Made Simple

Original price was: R1500,00.Current price is: R1200,00.

USD: $72.62 | GBP: £54.74 | EUR: €64.78

365 DAYS SUBSCRIPTION

FabLite Manager is a project tracking and reporting tool for steel detailing and fabrication workflows. It helps manage assemblies, drawings, revisions, bolt and anchor reports, IFC model access, and nesting outputs in one workspace.

Downloadable Files +

Add to Wishlist
Add to Wishlist
  Ask a Question
Guaranteed Safe Checkout

FabLite Manager is built for steel detailing and fabrication teams who need better control over project information before fabrication starts.

The software brings key project data into one workspace, making it easier to track assemblies, drawings, revisions, material impact, bolts, anchors, IFC model information, and nesting outputs. Instead of manually checking multiple files and reports, FabLite Manager helps organise the information so teams can quickly see what changed, what needs attention, and what can move forward.

With the dashboard and command centre, users can review project status, drawing impact, material changes, estimated review time, and the overall project footprint. The assembly and drawing sections allow teams to track statuses, due dates, linked drawings, revisions, and project progress more clearly.

FabLite Manager also includes bolt and anchor reporting tools, including combined bolt outputs to help prepare cleaner purchasing information. Anchor selections can be reviewed and edited for better control over vendor, type, product, size, length, embedment, finish, and notes.

The revision comparison tools help identify changed, deleted, and new items between imports, allowing teams to review project changes more efficiently. The IFC model section provides quick access to imported IFC model information, while the nesting tools assist with profile and plate nesting to support better material planning and reduce waste.

Key Features:

  • Project dashboard and command centre
  • Assembly tracking and management
  • Drawing register and revision tracking
  • Import comparison and change detection
  • Bolt and anchor reporting
  • Combined bolt output for purchasing
  • Anchor editing and selection control
  • IFC model access
  • Profile 1D nesting
  • Plate 2D nesting
  • Export-ready project reports

FabLite Manager — Track. Compare. Fabricate.

Built for steel detailing and fabrication workflows.

Reviews

There are no reviews yet.

Be the first to review “Yearly – FabLite Manager – Steel Project Control Made Simple”

Your email address will not be published. Required fields are marked *

No more offers for this product!

General Inquiries

There are no inquiries yet.